Working with your kitchen fitter
Kitchen electrics happen in two visits. First fix is done after the old kitchen comes out and before the new one goes in, with cables run to agreed positions from the fitter's plan. Second fix follows once units, worktops and splashbacks are in, when sockets, switches, lights and appliances are connected.
- Positions taken from the kitchen designer's plan and checked on site
- First fix timed with the fitter so there is no waiting around
- Back boxes set to suit tiles, glass or upstands
- Second fix and testing completed once the worktops are in

